April construction photos...Garden infrastructure work continues with some concrete footers poured and continued moving of earth and gravel. |
![]() |
The sign facing Center Ridge Road explains the hubbub to passersby! |
![]() |
Underground electrical conduit is laid out to eventually power garden lighting. The tube in the foreground will become the base for a light post. |
![]() |
Workers are busy with concrete, forms, and electrical conduit as a load is delivered to the garden construction site. |
![]() |
Tube is filled with concrete to surround electrical conduit and form the solid base for a light post. |
![]() |
Plywood forms hold the shape of things to come... |
![]() |
Sculpted shapes of the "mosaic tile sitting wall" appear as workers also remove forms from light pole bases and fill in some holes. |
![]() |
Masonry, stone base material, and topsoil begin to arrive on site. |
![]() |
One big concrete pour and the garden walkways appear. Heavy wooden posts are the beginnings of a pergola. |
![]() |
With protective plastic sheeting removed, the hardening concrete pathway is surrounded by April 25th's surprise snow! The snow quickly melted away and work continued. |
![]() |
The snow's all gone and the first pavers are placed atop a smooth sand base. |